美女色av一区二区三区-亚洲欧洲熟妇自拍偷拍-女同久久国产精品99国产精品-91精品国产丝袜高跟在线

CONTACT

CONTACT:Mr. Xu

+86-13771502818
+86-18762620800
E-mial:xu@wxguode.com Address:Siqian Village, Nanhu Community, Binhu District, Wuxi City

Vacuum chamber baking

Observe the change in the degree of vacuum when the vacuum chamber is baked, and the baking is performed by winding the heating belt. When the degree of vacuum reached about 10-3 Pa, the heating belt was gradually energized and heated, and the chamber was kept baked at 150 ° C for a long time. The ion pump is turned off during the baking process, and the ion pump is also energized for heating and baking. At this time, the vacuum chamber is only exhausted by the molecular pump and the foreline pump. As the temperature of the cavity increases, a large amount of gas molecules such as water vapor adsorbed on the inner surface of the cavity are released, and the degree of vacuum rapidly deteriorates. The amount of gas released gradually decreases with the extension of the baking time, so the degree of vacuum is gradually improved. When the baking is stopped, the baking power of the heating belt and the ion pump is cut off, and then the titanium sublimation pump is degassed while the crucible body is still at a high temperature. The degassing treatment of the titanium sublimation pump refers to the operation of heating the Ti wire, but controlling the temperature below the sublimation temperature of Ti. The purpose of the degassing treatment of the titanium sublimation pump is to remove the gas molecules adsorbed on the surface of the Ti wire and other possible contaminants to ensure the normal operation of the titanium sublimation pump. After fully completing the degassing treatment of the titanium sublimation pump, the ion pump and the titanium sublimation pump are activated to increase the intensity of the vacuum exhaust. As the exhaust force increases and the gas evolution decreases due to the lowering of the chamber temperature, the vacuum of the system will rapidly improve.

When the newly completed cavity is first baked, it usually takes one week, and the individual baking time after repeated baking can be appropriately reduced. In order to accurately measure the degree of vacuum, the vacuum gauge should also be degassed after stopping the baking. If the vacuum pump is fully capable and the baking time is sufficient, the vacuum can be increased by several orders of magnitude after baking.

One atmosphere produces a pressure of about 1 kgf over an area of ??1 cm2, and for a flange of 20 cm diameter, it is a pressure of 1 t. Cylindrical or spherical cavities, due to the special structure of the structure, the pressure is dispersed, and the wall thickness of the cavity is not deformed by 2 to 4 mm. However, for a square cavity, the side plate has to withstand a pressure of ton, and it is necessary to increase the wall thickness or set the rib to prevent deformation. The square cavity is generally heavier than the cylindrical and spherical cavity, and the price is high. Several representative vacuum chambers are shown, cylindrical, spherical, and square, respectively.
2019/06/04 19:25:05 4126 次

Related Documents

Copy right ? 2019 Wuxi Guode Machinery Manufacturing Co., Ltd. Record number: Su ICP No. 19021329
泡芙啪啪啪黄色污污| 无码成人一区二区| 美女人的逼免费观看| 一区二区在线不卡| 欧美精品一区二区三区四区五区| 帅哥大鸡巴操美女| 久久婷婷综合五月一区二区| 藏经阁91福利私人试看| 色999日韩自偷自拍美女| 色男人天堂亚洲男人天堂| 女生的鸡鸡色色软件 | 中日韩VA无码中文字幕| 日本一区二区高清免费不卡| 大屌把女生逼逼操肿国产| 操女人大逼视频下载| 操世界最美丽的逼片| 国产精品亚洲一区二区三区下载| 国产精品高潮久久久久a| 国产精品高潮久久久久a| 91秦先生全集在线观看 | 精品久久久久中文字幕人| 大粗鳮巴r教师人妻91| 天天干天天操天天插| 在线观看免费视频a v| 怎么样操女人的逼亚洲Av黄片段| 99热这里只有精品亚洲| 九九在线精品亚洲国产| 欧美日韩久久久一区二区三区 | 免费观看的黄视频一级国产 | 为什么搜索不到裸体| 我和两个老师的浮乱生活| 国产免费好大好硬| 久久综合娱乐中文网| 老司机免费福利午夜入口| 天天天天天干夜夜夜夜夜操| 非洲男生操男生屁眼视频| 欧美日韩久久久一区二区三区| 偷窥国内肥臀老熟女视频| 国产日本欧美激情| 日本一区二区三区高潮喷吹| 国产精品亚洲1区2区|